Analysis to detect losses in production orders of a printing press
PDF (Español)

Keywords

Muestreo
diagrama de flujo
SMED
costos
mermas. Sampling
flow chart
SMED
costs
losses

How to Cite

Rodríguez Juárez, J. D., Romero Flores, E. A., & Cabrera Zepeda, G. (2020). Analysis to detect losses in production orders of a printing press. Interconectando Saberes, (10). https://doi.org/10.25009/is.v0i10.2650

Abstract

This article describes the research project carried out at a printing press in the city of Orizaba, Ver. to identify and determine the cost per waste by applying administrative tools such as: sampling, flow chart and SMED. The methodology used consists of an analysis of historical information of the production orders from July to October 2018, carrying out the direct observation of the four printing processes, the timing of the activities executed by the operator to the preparation machines and printing and the follow-up of the production order by the departments from its creation to the conclusion.
https://doi.org/10.25009/is.v0i10.2650
PDF (Español)

References

Bortolotti, T., Boscari, S., & Danese, P. (2015). Successful lean implementation: Organizational culture and soft lean practices. International Journal of Production Economics, 160, 182–201. https://doi.org/https://doi.org/10.1016/j.ijpe.2014.10.013

Burbano Ruiz, J., & Ortiz Gómez, A. (1995). Presupuestos Enfoque moderno de planeación control de recursos (2nd ed.). McGraw-Hill.

Dennis, P. (2015). Lean Production simplified: A plain-language guide to the world’s most powerful production system (3rd ed.). Crc press.

Fryman, M. A. (2002). Quality and Process Improvement. Cengage Learning.

Gitman, L., & Zutter, C. (2012). Principios de administración financiera (12th ed.). Pearson Educación.

Hernántez Matías, J. C., & Vizán Idolpe, A. (2013). Lean manufacturing: concepto, técnicas e implantación. Fundación EOI.

Kendall, K. (2011). Reglas generales para el dibujo de diagramas de lógicos de flujo de datos. In Análisis y diseño de sistemas de información (8th ed., p. 201). Prentice Hall – Pearson.

Madariaga, F. (2014). Lean manufacturing. Bubok.

Morillo, M. (2001). Rentabilidad Financiera y Reducción de Costos. Actualidad Contable Faces, 4(4), 35–48. https://www.redalyc.org/pdf/257/25700404.pdf

Sarria Yépez, M. P., Fonseca Villamarín, G. A., & Bocanegra, C. C. (2017). Modelo metodológico de implementación de lean manufacturing. Revista EAN, 83, 51–71. https://doi.org/10.21158/01208160.n83.2017.1825

Shingo, S. (2017). Una revolución en la producción: El sistema SMED (3rd ed.). TGP Tecnologías de Gerencia y Producción, S.A.

Sira, S. (2011). Aplicación tecnológica del Diagrama Hombre-Máquinas. Revista INGENIERÍA UC, 18(3), 17–28.